PRACTICE / ENTERPRISE

Cutover is a paragraph in the runbook, not the headline.

Migration without the surprises.

We move systems, data, and applications into modern environments with the discipline migrations demand — inventory, parity testing, parallel runs, and the runbook to roll back if reality disagrees with the plan.

  1. 01Cloud Migration
  2. 02Data Migration
  3. 03Application Migration
  1. Cloud Migration

    Shift to AWS, Azure, or GCP with hybrid and multi-cloud options — fast, secure, and scalable.

    DELIVERED WITHAWS MGN · Azure Migrate · GCP M4A

  2. Data Migration

    Move structured and unstructured data with full validation and integrity checks.

    DELIVERED WITHAWS DMS · Azure DMS · Striim

  3. Application Migration

    Modernize outdated apps or re-architect them for modern cloud-native ecosystems.

    DELIVERED WITHContainerize · Refactor · Replatform

  4. Infrastructure Migration

    Upgrade or consolidate servers, storage, and databases for optimized performance.

    DELIVERED WITHVMware HCX · Nutanix Move

  5. Database Migration

    Cross-platform migration with schema optimization and performance tuning.

    DELIVERED WITHDMS · Schema Conv · Liquibase

  6. Post-Migration Optimization

    Continuous performance monitoring, updates, and real-time issue resolution.

    DELIVERED WITHDatadog · CloudWatch · APM

02 / ENGAGEMENT SPINE

How a vyu migrations engagement actually runs.

Five phases — each with a clear deliverable so the progress is checkable, not vibes. Phases overlap in practice; the rail is sequence, not gates.

  1. 01

    Discover

    Inventory the estate down to the data record. Identify the dependencies that aren't in any diagram yet.

    • Estate inventory
    • Dependency map
    • Risk register
  2. 02

    Design

    Pick the right R (rehost, replatform, refactor, retire) per workload. Document the answer per workload.

    • 6Rs decision
    • Target architecture
    • Cutover plan
  3. 03

    Engineer

    Build parallel-run plumbing, parity tests, and the rollback path before touching the cutover switch.

    • Parity tests
    • Rollback path
    • Pilot wave
  4. 04

    Deploy

    Cut over by wave with shadow runs and explicit go/no-go gates. Reconcile every counter that matters.

    • Wave cutovers
    • Reconciliation
    • Go/no-go log
  5. 05

    Operate

    Post-migration optimisation — rightsizing, performance tuning, and the decommissioning of legacy paths.

    • Rightsizing
    • Decom plan
    • Quarterly review

03 / TOOLCHAIN

What we reach for on vyu migrations engagements.

Tools are choices, not commitments — substitute per your environment. The grouping below is the shape of the stack, not a vendor list.

TOOLING

  • AWS MGN
  • Azure Migrate
  • GCP M4A
  • Nutanix Move

DATA MOVEMENT

  • AWS DMS
  • Striim
  • Debezium
  • Fivetran

CONTAINERIZATION

  • Kubernetes
  • Docker
  • ECS Anywhere

SCHEMA & DB

  • Liquibase
  • Flyway
  • Schema Conversion Tool

OBSERVABILITY

  • Datadog
  • CloudWatch
  • Dynatrace

Bring your vyu migrations brief.A principal responds within one business day.